Merge lane: jaah
Merge lane run: batch the queued PRs, run the full gate (if any) once on their merged tree, and merge the batch when it is green. Filed by the control plane (`app/merge_lane.py::ensure_lane`).
Outcome
Merged 9 PRs (#5945–#5953) to develop in 6 quick-gated batches, all green (5775 tests); none ejected. develop head 3927288fc. Stale develop_red (0bf03ca) is a compose-stack start failure in the base check, not code.
Artifacts
- report.html
- gate-1-3cf970b39a-green.log
- gate-1-c72cdd1800-green.log
- gate-1-507150537f-green.log
- gate-1-7a41fd5938-green.log
- gate-1-a8973d551f-green.log
- gate-1-943e06a30f-green.log
Activity
- Ready
- Runner started
- Runner ended (done)